Sites under Construction

"Romantica" Kavarna sity

The complex is near by the sea and comprising of three residential buildings and two residential houses.

There are underground parking lot for 28 cars. Into the complex there are coffee-shop, tennis-hall, a terrace with two swimming-pools and onother 10 park-places. All apartments are with south, south-east and south-west exposure.

Starting date: December 2007

Term of ending: December 2009

As all the sites of FINA 5, this building will also be constructed with

  • Monolithic reinforced-concrete construction,
  • Brick walls,
  • Heat isolation and mineral coating,
  • PVC millwork, with glass-panelling of Austrian manufacture– ACCORD
  • Air-conditionary
  • Staircases and foyers with granite-grease floor coating and metal railings
  • Luxury elevator
  • Constructed internal connection for electricity, water supply, sewerage.

Apartments

  • Floors - terracotta, parquet, granite(gress) or laminate
  • Walls and ceilings – plaster patting and latex
  • Joinery
    • windows - PVC, with glass packet, Austrian make
    • Front door – massive, metal, three-sided locking
    • internal flat doors - massive, MDF or laminate in optional color and model
  • Electric installation – mounted switches and plugs, without lighting fixtures for the apartments and mounted ones for the stores
  • Water conduit – with mounted water meters for hot and cold water, mixers and sanitary equipment in baths and lavatories
  • Balconies – granite(gress)

The fulfillment of housing parts is “up to key”, completely ready. FINA 5 offers the clients the opportunity to choose the type of finishing works and the materials for them.


Dojran

Residential Building with Stores, Underground Garages In Regulated Land Property (RLP) ˛ - 588, quarter 18, area Belite brezi, 4 Chepino str., Sofia City.

Overall Built-in Area (OBA): 3 216 m2

The building is with underground parking lot for 25 cars, 4 stores, 2 Offices, located , one residential entrances with a total of 20 apartments and studios and 19 lofts for the apartments.

Starting date: March 2008

Term of ending: September 2010

As all the sites of FINA 5, this building will also be constructed with

  • Monolithic reinforced-concrete construction,
  • Brick walls,
  • Heat isolation and mineral coating,
  • PVC millwork, with glass-panelling of Austrian manufacture– ACCORD
  • Armored front doors
  • Aluminium radiators; with electronic heat meters for every object;
  • Staircases and foyers with granite-grease floor coating and metal railings
  • elevator.
  • Constructed internal connection for electricity, water supply, sewerage and heating, with an installed and fully equipped distribution station, accompanied with the respective documentation for putting into exploitation.

Apartments and Stores

  • Floors – terracotta, granite ground coat or laminated parquet
  • Walls and ceilings – plaster patting and latex
  • Joinery
    • windows - PVC, with glass packet, Austrian make
    • Front door – massive, metal, three-sided locking for the apartment and glass doors for the stores.
    • internal flat doors - massive, MDF or laminate in optional color and model
  • Heating bodies – aluminium radiators
  • Electronic heat meter for the heating flat installation
  • Electric installation – mounted switches and plugs, without lighting fixtures for the apartments for the apartments and mounted ones for the stores
  • Water conduit – with mounted water meters for hot and cold water, mixers and sanitary equipment in baths and lavatories
  • Balconies – granite(gress)

The fulfillment of housing parts is “up to key”, completely ready.

FINA 5 offers the clients the opportunity to choose the type of finishing works and the materials for them.


Ovcha Kupel 2

Residential Building with Stores on Two Levels and Underground Garages In Regulated Land Property (RLP) ˛˛ - 865, quarter 3, area OVCHA KUPEL 2, 107 OBIKOLNA str., Sofia City.

Overall Built-in Area (OBA): 8 714 m2

The building is on 11 levels with underground parking lot for 29 cars, 20 stores, chemist’s and coffee-shop, located on two levels, two residential entrances with a total of 65 apartments and studios, one maisonette, and 38 lofts for the apartments.

Starting date: January 2007

Term of ending: September 2009

As all the sites of FINA 5, this building will also be constructed with

  • Monolithic reinforced-concrete construction,
  • Brick walls,
  • Heat isolation and mineral coating,
  • PVC millwork, with glass-panelling of Austrian manufacture– ACCORD
  • Armored front doors
  • Aluminium radiators; with electronic heat meters for every object;
  • Staircases and foyers with granite-grease floor coating and metal railings
  • elevator.
  • Constructed internal connection for electricity, water supply, sewerage and heating, with an installed and fully equipped distribution station, accompanied with the respective documentation for putting into exploitation.

Apartments and Stores

  • Floors – terracotta, granite ground coat or laminated parquet
  • Walls and ceilings – plaster patting and latex
  • Joinery
    • windows - PVC, with glass packet, Austrian make
    • Front door – massive, metal, three-sided locking for the apartment and glass doors for the stores.
    • internal flat doors - massive, MDF or laminate in optional color and model
  • Heating bodies – aluminium radiators
  • Electronic heat meter for the heating flat installation
  • Electric installation – mounted switches and plugs, without lighting fixtures for the apartments for the apartments and mounted ones for the stores
  • Water conduit – with mounted water meters for hot and cold water, mixers and sanitary equipment in baths and lavatories
  • Balconies – granite(gress)

The fulfillment of housing parts is “up to key”, completely ready.

FINA 5 offers the clients the opportunity to choose the type of finishing works and the materials for them.



Home · Sale and rents · Sites under construction · Completed sites · About the company · Contact us